Project

General

Profile

Manufacturing Process » History » Version 14

Dimitris Pipelias, 11/18/2025 02:49 PM

1 1 Dimitris Pipelias
# Manufacturing Process
2
#
3
#
4
#
5
6
### 1. PCB Manufacturing / Soldering
7
8
Description of the printed circuit board (PCB) manufacturing and soldering process.
9
1. PCB preparation
10
2. Component placement
11
3. Soldering process
12
4. Visual inspection
13
πŸ“Œ Note: Insert photos here showing the PCB manufacturing steps.
14
#
15
16
### 2. Components Assembly
17
Description of the procedure for assembling the electronic components of the amplifier.
18
1. Module placement
19
2. Wiring
20
3. Securing components
21
4. Functional testing
22
πŸ“Œ Note: Insert images here showing assembly steps.
23
#
24 9 Dimitris Pipelias
#
25 1 Dimitris Pipelias
26 4 Dimitris Pipelias
## 3. Testing / Case Assembly
27 1 Dimitris Pipelias
#
28 14 Dimitris Pipelias
#
29 9 Dimitris Pipelias
30 4 Dimitris Pipelias
### β€’ Initial test
31 1 Dimitris Pipelias
32 3 Dimitris Pipelias
![](image1.jpg)
33 1 Dimitris Pipelias
34
1. Visual inspection to ensure that all components on the board are correctly placed.
35 12 Dimitris Pipelias
πŸ“Œ Note: Check for a missing coil, as this is a common failure point (Fig. 1).
36
2. Set the HDMOD-1 source (with RF output of 90dB) on channel 21 (MHz: fill in the exact frequency).
37
3. Connect the output to a 20dB attenuator.
38
4. Measure the PWR level at the output of the 20dB attenuator using the field meter. The desired power value to confirm correct operation of the source before connecting the amplifier is 69dBuV (Fig. 2).
39 1 Dimitris Pipelias
 πŸ“Œ Note: 90dB (source) – 20dB (attenuator) + 36dB (DA102 amplifier) – 1dB (cable losses) = 69dB.
40
41 8 Dimitris Pipelias
42 7 Dimitris Pipelias
![](image2.jpg)
43 1 Dimitris Pipelias
44 12 Dimitris Pipelias
5. Place the amplifier between the source and the field meter, and power it with 12V DC, verifying a current consumption of approximately 270mA (Fig. 3).
45
6. Set the attenuation and equalizer switches to their maximum position (Fig. 4).
46
7. Connect the output to a 30dB attenuator (required due to the DA102 36dB gain).
47
8. Measure the PWR level at the output of the 30dB attenuator using the field meter. The desired power value to confirm correct operation of the DA102 amplifier is 75dB (Fig. 5).
48 1 Dimitris Pipelias
 πŸ“Œ Note: 90dB (source) – 20dB (first attenuator) + 36dB (DA102 amplifier) – 30dB (second attenuator) – 1dB (cable losses) = 75dBuV.
49
#
50 5 Dimitris Pipelias
51 9 Dimitris Pipelias
### β€’ Case Assembly
52 5 Dimitris Pipelias
53 9 Dimitris Pipelias
![](image3.jpg)
54 6 Dimitris Pipelias
55 12 Dimitris Pipelias
1. Local removal of the Solder Mask (green coating) (Fig. 6) using an appropriate tool, in order to expose the Copper Layer (copper coating) (Fig. 7).
56 11 Dimitris Pipelias
πŸ“Œ Note: Soldering is performed between the PCB copper surface and the metal surface of the case, as solder cannot adhere to the Solder Mask.
57
πŸ“Œ Note: *This step may be omitted in the future with a redesigned PCB.*
58 12 Dimitris Pipelias
2. Tightening of the nuts and placement of the washers, preparing the board for insertion into the metal case (Fig. 8).
59
πŸ“Œ Note: The internal nuts should be tightened only until they make contact with the SMT connectorsβ€”no additional torque should be applied. The washers must be oriented so that the flat side faces the nut, while the curved side faces the metal case that will be installed in the next step.
60
61
![](image4.jpg)
62 10 Dimitris Pipelias
63 13 Dimitris Pipelias
3. Insert the PCB into the metal enclosure, ensuring that the openings where the SMT connectors protrude have the two washers positioned on each side.
64
4. Place the two metal rods, which hold the PCB at the required height from the bottom of the enclosure (Fig. 9).
65
5. Solder the PCB to the enclosure using a soldering iron around the perimeter, at the points where the copper layer is exposed, and then remove the metal rods.
66
6. Tighten the nuts onto the enclosure using slim adjustable wrenches that can fit inside the enclosure (Fig. 10).
67
πŸ“Œ Note: The nuts on both connectors must be tightened evenly to avoid bending or deforming the metal surface between them.
68 1 Dimitris Pipelias
7. Install and secure the metal cover (Fig. 11).
69 14 Dimitris Pipelias
70
![](image5.jpg)
71
72
8. Install the metal base and the two side panels (Fig. 12), after first removing the protective adhesive film from the base (Fig. 13).
73
9. Align and secure the amplifier to the base and side panels, fastening it diagonally with 4 Phillips 3Γ—6 screws (Fig. 14).
74
75
![](image6.jpg)
76
77
10. Install
78
11. 
79 1 Dimitris Pipelias
80
### Step-by-Step Workflow
81
1. Materials and PCB reception
82
2. Incoming quality control
83
3. Soldering and visual inspection
84
4. Components assembly
85
5. Wiring
86
6. Housing installation
87
7. Final functional testing
88
8. Packaging
89
πŸ“Œ Note: Insert diagrams or pictures illustrating the workflow.