Project

General

Profile

Manufacturing Process » History » Version 57

Dimitris Pipelias, 03/20/2026 04:40 PM

1 1 Dimitris Pipelias
# Manufacturing Process
2
#
3
#
4
#
5
6 35 Dimitris Pipelias
## 1. PCB Manufacturing / Soldering
7
#
8
#
9 1 Dimitris Pipelias
10 37 Dimitris Pipelias
### • DA102 Project
11 41 Dimitris Pipelias
📌 Note: Navigate to the server folder path: *Z:\R&D\Path.*
12 48 Dimitris Pipelias
```
13 49 Dimitris Pipelias
📌 Σημείωση: Μεταβείτε στη διαδρομή του φακέλου στον διακομιστή (server): *Z:\R&D\Path.*
14 48 Dimitris Pipelias
```
15 37 Dimitris Pipelias
### • Component Datasheets
16 39 Dimitris Pipelias
📌 Note: Refer to the Files section
17 50 Dimitris Pipelias
```
18
📌 Σημείωση: Ανατρέξτε στην ενότητα «Αρχεία» (Files).
19
```
20 42 Dimitris Pipelias
### • Board Order
21
📌 Note: 
22
#
23 1 Dimitris Pipelias
#
24
25 36 Dimitris Pipelias
## 2. Components Assembly
26
#
27
#
28
29 53 Dimitris Pipelias
Procedure for assembling the electronic components of the amplifier.
30 1 Dimitris Pipelias
1. Module placement
31
2. Wiring
32
3. Securing components
33
4. Functional testing
34 51 Dimitris Pipelias
```
35 53 Dimitris Pipelias
Διαδικασία συναρμολόγησης ηλεκτρονικών εξαρτημάτων του ενισχυτή.
36 52 Dimitris Pipelias
37
   1. Τοποθέτηση μονάδων (modules)
38
   2. Καλωδίωση
39
   3. Στερέωση εξαρτημάτων
40 55 Dimitris Pipelias
   4. Λειτουργικός έλεγχος
41 51 Dimitris Pipelias
```
42 46 Dimitris Pipelias
43 1 Dimitris Pipelias
📌 Note: Insert images here showing assembly steps.
44 54 Dimitris Pipelias
```
45 56 Dimitris Pipelias
📌 Σημείωση: Εισαγάγετε εδώ εικόνες που απεικονίζουν τα στάδια συναρμολόγησης.
46 54 Dimitris Pipelias
```
47 1 Dimitris Pipelias
#
48 9 Dimitris Pipelias
#
49 1 Dimitris Pipelias
50 4 Dimitris Pipelias
## 3. Testing / Case Assembly
51 1 Dimitris Pipelias
#
52 14 Dimitris Pipelias
#
53 9 Dimitris Pipelias
54 17 Dimitris Pipelias
### • Functional test
55 1 Dimitris Pipelias
56 3 Dimitris Pipelias
![](image1.jpg)
57 1 Dimitris Pipelias
58
1. Visual inspection to ensure that all components on the board are correctly placed.
59 12 Dimitris Pipelias
📌 Note: Check for a missing coil, as this is a common failure point (Fig. 1).
60 18 Dimitris Pipelias
2. Set the HDMOD-1 source (with RF output of 90dB) on channel 21 (474.00MHz).
61 12 Dimitris Pipelias
3. Connect the output to a 20dB attenuator.
62
4. Measure the PWR level at the output of the 20dB attenuator using the field meter. The desired power value to confirm correct operation of the source before connecting the amplifier is 69dBuV (Fig. 2).
63 43 Dimitris Pipelias
 📌 Note: 90dBuV (source) – 20dB (attenuator) – 1dB (cable losses) = 69dBuV.
64 57 Dimitris Pipelias
```
65
1. Οπτικός έλεγχος επιβεβαιώνοντας την ορθή τοποθέτηση όλων των εξαρτημάτων επί της πλακέτας.
66
📌 Σημείωση: Ελέγξτε την τυχόν απουσία του πηνίου, καθώς αποτελεί σύνηθες σημείο αστοχίας (Εικ. 1).
67
2. Ρύθμιση της πηγής HDMOD-1 (με έξοδο RF 90dB) στο κανάλι 21 (474.00MHz).
68
3. Σύνδεση της εξόδου σε εξασθενητή 20dB.
69
4. Μέτρηση της στάθμης ισχύος (PWR) στην έξοδο του εξασθενητή 20dB με τη χρήση πεδιόμετρου. Η επιθυμητή τιμή ισχύος για την επιβεβαίωση της ορθής λειτουργίας της πηγής, πριν από τη σύνδεση του ενισχυτή, είναι 69dBuV (Εικ. 2).
70
 📌 Σημείωση: 90dBuV (πηγή) - 20dB (εξασθενητή) - 1dB (απώλειες καλωδίου) = 69dBuV.
71
```
72 1 Dimitris Pipelias
73 8 Dimitris Pipelias
74 7 Dimitris Pipelias
![](image2.jpg)
75 1 Dimitris Pipelias
76 12 Dimitris Pipelias
5. Place the amplifier between the source and the field meter, and power it with 12V DC, verifying a current consumption of approximately 270mA (Fig. 3).
77
6. Set the attenuation and equalizer switches to their maximum position (Fig. 4).
78
7. Connect the output to a 30dB attenuator (required due to the DA102 36dB gain).
79
8. Measure the PWR level at the output of the 30dB attenuator using the field meter. The desired power value to confirm correct operation of the DA102 amplifier is 75dB (Fig. 5).
80 32 Dimitris Pipelias
 📌 Note: 90dBuV (source) – 20dB (first attenuator) + 36dB (DA102 amplifier) – 30dB (second attenuator) – 1dB (cable losses) = 75dBuV.
81 1 Dimitris Pipelias
#
82 5 Dimitris Pipelias
83 9 Dimitris Pipelias
### • Case Assembly
84 5 Dimitris Pipelias
85 9 Dimitris Pipelias
![](image3.jpg)
86 6 Dimitris Pipelias
87 12 Dimitris Pipelias
1. Local removal of the Solder Mask (green coating) (Fig. 6) using an appropriate tool, in order to expose the Copper Layer (copper coating) (Fig. 7).
88 11 Dimitris Pipelias
📌 Note: Soldering is performed between the PCB copper surface and the metal surface of the case, as solder cannot adhere to the Solder Mask.
89
📌 Note: *This step may be omitted in the future with a redesigned PCB.*
90 12 Dimitris Pipelias
2. Tightening of the nuts and placement of the washers, preparing the board for insertion into the metal case (Fig. 8).
91
📌 Note: The internal nuts should be tightened only until they make contact with the SMT connectors—no additional torque should be applied. The washers must be oriented so that the flat side faces the nut, while the curved side faces the metal case that will be installed in the next step.
92
93
![](image4.jpg)
94 10 Dimitris Pipelias
95 13 Dimitris Pipelias
3. Insert the PCB into the metal enclosure, ensuring that the openings where the SMT connectors protrude have the two washers positioned on each side.
96
4. Place the two metal rods, which hold the PCB at the required height from the bottom of the enclosure (Fig. 9).
97
5. Solder the PCB to the enclosure using a soldering iron around the perimeter, at the points where the copper layer is exposed, and then remove the metal rods.
98
6. Tighten the nuts onto the enclosure using slim adjustable wrenches that can fit inside the enclosure (Fig. 10).
99
📌 Note: The nuts on both connectors must be tightened evenly to avoid bending or deforming the metal surface between them.
100 1 Dimitris Pipelias
7. Install and secure the metal cover (Fig. 11).
101 14 Dimitris Pipelias
102
![](image5.jpg)
103
104
8. Install the metal base and the two side panels (Fig. 12), after first removing the protective adhesive film from the base (Fig. 13).
105
9. Align and secure the amplifier to the base and side panels, fastening it diagonally with 4 Phillips 3×6 screws (Fig. 14).
106
107
![](image6.jpg)
108
109 15 Dimitris Pipelias
10. Vertically position the metal top cover of the case (Fig. 15), ensuring that the two switches and the LED align correctly with their respective openings.
110
11. Secure the cover to the main body, fastening it diagonally with 4 Allen 3×6 screws (Fig. 16).
111 16 Dimitris Pipelias
#
112
113 17 Dimitris Pipelias
### • Network and Spectrum Analyzer test
114 16 Dimitris Pipelias
115
![](image7.jpg)
116 1 Dimitris Pipelias
117 21 Dimitris Pipelias
1. Connect the input to the output of the Network Analyzer using the appropriate cables (Fig. 17), ensuring that a 20 dB attenuator is inserted in series between the two ports.
118 18 Dimitris Pipelias
119
Press "PRESET" -> OK
120
Press "START" -> 100MHz
121
Press "STOP" -> 1200MHz
122
123
Press "MEAS" -> S21
124
125
Press "CAL" -> CALIBRATE -> RESPONSE -> THRU -> DONE
126
Press "DISPLAY" -> NUM OF TRA -> 2
127
128
2. For the amplifier measurements, connect its input to the step attenuator, into which the signal from three generators is combined via a splitter, and connect its output to the network analyzer.
129
3. Set the attenuation and equalizer switches to their maximum position.
130
📌 Note: For the amplifier, **ALWAYS** ensure to connect the input and output cables before powering the unit.
131
132
Press "MEAS" -> S11
133
134 21 Dimitris Pipelias
4. Identify measurement points at multiple frequency values in order to evaluate the ripple across the response curve (Fig. 18).
135 18 Dimitris Pipelias
136
Press "POWER" -> PC
137
📌 Note: Use the mouse to select the dBm field and adjust the value using the ***up*** and ***down*** arrow controls.
138 19 Dimitris Pipelias
139 20 Dimitris Pipelias
5. Ensure that the response curve exhibits a return loss greater than −10dB.
140 21 Dimitris Pipelias
6. ????? (Fig. 19).
141 18 Dimitris Pipelias
142
Press "DISPLAY" -> NUM OF TRA -> 2
143 1 Dimitris Pipelias
144 22 Dimitris Pipelias
![](image8.jpg)
145
146 23 Dimitris Pipelias
Press "PRESET" -> AUTO ALIGIN -> OFF
147
148
7. Connect the input to the output of the Spectrum Analyzer using the appropriate cables.
149
8. Set the center frequency to 605.0MHz.
150
9. Initially, set the attenuator to 0dB.
151
10. Adjust the width span parameter to 35.0MHz.
152
11. Manually configure the CPL by setting the RBW parameter to 100kHz and the VBW parameter to 10kHz.
153
12. Manually configure the AMPL REF LEVEL parameter to -100dBm, set the AMPL ATTENUATOR to 0dB, and select dBuV for the AMPL UNIT.
154
13. Confirm losses from mixer, filter, and cable = -14dBuV.
155 25 Dimitris Pipelias
#
156 30 Dimitris Pipelias
157 23 Dimitris Pipelias
14. Set the first generator to a frequency of 600.000MHz and the second generator to 610.000MHz. Adjust the RF output level to 100.000dBuV.
158 28 Dimitris Pipelias
15. Initially, set the attenuator to 30dB.
159 1 Dimitris Pipelias
📌 Note: Set the attenuation switch to its maximum position and the equalizer to its minimum position (Fig. 20).
160 30 Dimitris Pipelias
16. Select the peaks of the two "high" Δ functions, via the dial and ensure they are at the same dBuV level.
161
17. Using the MKR NORMAL and MKR DELTA options, adjust the cursor to the peaks of the two “high” and two “low” Δ functions to measure their values.
162
18. Ensure that the difference between the “high” and “low” peaks is -60dBuV.
163 31 Dimitris Pipelias
19. Calculate the gain of the specific amplifier (DA102) so that it matches the manufacturer’s specifications (Fig. 21).
164 32 Dimitris Pipelias
 📌 Note: 83dBuV ("high" peak) + 30dB (attenuator) + 1dB (cable losses) = 114dBuV (DA102 amplifier).
165 26 Dimitris Pipelias
#
166 34 Dimitris Pipelias
20. The final step consists of labeling the LOT# identification and completing the product packaging.
167 33 Dimitris Pipelias
#